on Waga Energy (EPA:WAGA)
First injection of biomethane in Europe from hybrid biogas

On December 18, 2024, VALTOM and Waga Energy launched a biomethane production unit in Clermont-Ferrand that is unique in Europe. Fueled by biogas from waste from the Puy-Long site and the Vernéa methanization plant, it uses patented WAGABOX® technology. The biomethane produced is directly injected into the GrDF network, supplying local homes and businesses.
The WAGABOX® station offers up to 15 GWh of biomethane per year, equivalent to the consumption of 2,000 homes, and avoids the emission of 2,500 tons of CO2. This project symbolizes a major step forward in decarbonization, with an investment of 3.5 million euros, supported by crowdfunding. It strengthens local energy sovereignty.
R. E.
Copyright © 2025 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.
Click here to consult the press release on which this article is based
See all Waga Energy news