BRIEF

on GETLINK (EPA:GET)

Technical Interruption of ElecLink Operations, Prior to Annual Planned Outage

Stock price chart of GETLINK (EPA:GET) showing fluctuations.

ElecLink has halted its electricity interconnector operations between Great Britain and France. This decision follows the detection of a fault in the system. The suspension aims to ensure safety and maintain infrastructure integrity. Activities will remain on hold until the scheduled annual outage period from October 6th to 9th. This pause will allow for an in-depth investigation into the defect's cause.

The company plans to announce the resumption date of operations once the investigation is complete.

R. H.

Copyright © 2024 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.

Click here to consult the press release on which this article is based

See all GETLINK news