BRIEF

on Vior Inc. (NASDAQ:VIORF)

Vior Updates Drill Program at Belleterre Gold Project

Vior Inc. has provided a progress update on its extensive 60,000-metre diamond drill program at the Belleterre Gold Project in Quebec. Since the program's initiation on September 23, 2024, 19 drill holes totaling 4,054 metres have been completed in the Belleterre Mine area, revealing potential extensions of known mineralization.

President and CEO Mark Fedosiewich expressed optimism, highlighting early indications of significant extensions of sulphide mineralized quartz-veining near past production areas. The drilling aims to advance the understanding of the gold system's structure and continuity.

Thus far, more than 1,244 core samples have been sent for analysis, with results pending. The program temporarily relocated drill rigs to accommodate the provincial hunting season, planning to resume at Belleterre Mine post-season.

R. E.

Copyright © 2024 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.

Click here to consult the press release on which this article is based

See all Vior Inc. news