News
-
-
PRESS RELEASE
Aztec Drills 40 RC holes at Tombstone Project, Arizona in 2025, Continues to Expand Shallow Silver-Gold Mineralization
Aztec Minerals Corp. announces final results of additional RC drill holes and MA digestion results from TR25-16/17/17a, showing broad continuity of Ag-Au mineralization at Tombstone Property in Arizona -
-
PRESS RELEASE
Aztec Drills 8.14 gpt Gold and 49.67 gpt Silver over 36.5 meters, including 58.5 gpt Gold and 158.0 gpt Silver over 4.6 meters, at the Tombstone Project, Arizona
Aztec Minerals Corp. reports high-grade gold and silver intersections at Tombstone Property in Arizona with outstanding results from holes TR25-16 and TR25-17a -
-
PRESS RELEASE
Aztec Samples 30.2m of 3.72 gpt Gold and 167.93 gpt Silver (5.82 gpt AuEq) from Ongoing 2024 Surface Exploration Program at Tombstone Gold-Silver Project, Arizona
Aztec Minerals Corp. confirms wide high-grade gold and silver oxide mineralization on surface at the Tombstone project in southeastern Arizona, with potential for expansion -
-
PRESS RELEASE
Aztec Provides Update on 2024 Gold-Silver Exploration Program at Tombstone Project, Arizona
Aztec Minerals Corp. provides an update on the gold-silver exploration program at Tombstone Project in Arizona, aiming to expand the mineralized system through new drilling targets. CEO highlights potential value for shareholders -
-
PRESS RELEASE
Aztec Reports Final Gold and Multi-Element Results From 2023 RC Drilling from the Cervantes Project, Sonora, Mexico; Multiple, Shallow and Broad, Oxidized Gold Intercepts Continue the Expansion of the California Target Mineralized Zone
Aztec Minerals Corp. reports final results of 2023 RC drill program at Cervantes project in Sonora, Mexico, showcasing expanded gold mineralization and multi-element analysis findings