PRESS RELEASE

from Gungnir Resources Inc. (isin : CA40281L1094)

Gungnir Drills 12 Metres of 1.02% Nickel, Including 5.13 Metres of 1.75% Ni at Lappvattnet

SURREY, BC / ACCESSWIRE / January 30, 2023 / Gungnir Resources Inc. (TSXV:GUG)(OTC PINK:ASWRF) ("Gungnir" or the "Company") is pleased to report final assay results from the central part of the Company's Lappvattnet nickel deposit in northern Sweden. New results include hole LAP22-23 which drilled 12 metres grading 1.02% Ni at a down-hole depth of 38 metres. The central area hosts recently reported high-grade intercepts including 9 metres grading 2.35% Ni (hole LAP22-19) and 5.76 metres grading 4.04% Ni (hole LAP22-25). Please click link for long section (see Figure 1).

Highlights:

  • Hole LAP22-23, the easternmost hole drilled by Gungnir (Section 18E), cut 12 metres of 1.02% Ni, including 5.13 metres of 1.75% Ni
  • Numerous high-grade individual assays up to 4.98% Ni continue to demonstrate a robust high-grade nickel system; areas to the east and at depth only sparsely drilled
  • Drill contractor confirmed for 2023

"With each round of drilling we gain a better understanding of this high-grade nickel deposit and drill-spacing required to evaluate it. The next big test at Lappvattnet will be drilling below the 120-metre level and further along strike and down-plunge to the east. Geological work and planning for 2023 exploration continue," commented Jari Paakki, CEO.

Table 1: Complete Assay Results - Central Part of the Lappvattnet Nickel Deposit:

Hole ID

Zone

From (m)

To (m)

Length (m)

Ni %

Cu %

Co %

PGEs (g/t)

LAP22-19 *

Main

66.00

75.00

9.00

2.35

0.27

0.04

0.23

incl

69.00

74.66

5.66

3.02

0.33

0.05

0.33

#

72.19

74.66

2.47

4.10

0.19

0.07

0.29

#

70.53

71.39

0.86

3.65

0.08

0.06

0.19

#

72.19

72.39

0.20

6.49

0.04

0.11

0.31

#

72.90

73.31

0.41

6.74

0.08

0.11

0.40

#

73.72

74.19

0.47

5.20

0.04

0.08

0.29

Footwall

149.00

151.45

2.45

0.44

0.04

0.02

0.04

LAP22-25 *

Main

57.72

76.00

18.28

1.49

0.20

0.03

0.18

incl

70.00

75.76

5.76

4.04

0.23

0.08

0.43

#

70.00

70.51

0.51

4.93

0.04

0.08

0.40

#

70.51

71.20

0.69

3.73

0.09

0.08

0.32

#

72.00

72.86

0.86

3.17

0.09

0.07

0.24

#

72.86

73.20

0.34

7.18

0.04

0.12

0.45

#

73.20

73.68

0.48

3.14

0.27

0.06

0.24

#

73.68

73.86

0.18

5.17

0.02

0.06

0.26

73.86

74.28

0.42

1.13

1.20

0.02

0.23

#

74.28

74.91

0.63

5.52

0.11

0.11

0.45

#

74.91

75.14

0.23

5.94

0.05

0.08

0.49

#

75.14

75.52

0.38

4.15

0.18

0.08

0.46

#

75.52

75.76

0.24

5.70

0.05

0.16

0.38

LAP22-18 *

NSV

LAP22-16

O/B

Footwall

55.60

69.00

13.40

0.15

0.02

0.01

0.02

LAP22-17

Main

30.00

33.20

3.20

0.83

0.18

0.02

0.09

#

33.00

33.20

0.20

4.98

0.09

0.11

0.29

LAP22-20

Main

36.00

41.70

5.70

0.42

0.10

0.02

0.06

LAP22-21

Main

61.00

68.16

7.16

0.82

0.18

0.02

0.09

incl

65.34

68.16

2.82

1.52

0.30

0.04

0.16

#

66.10

66.30

0.20

2.89

0.17

0.06

0.23

#

67.26

68.16

0.90

2.66

0.20

0.09

0.20

LAP22-22

O/B

LAP22-23

Main

34.90

50.00

15.10

0.90

0.22

0.03

0.15

incl

38.00

50.00

12.00

1.05

0.25

0.03

0.18

incl

44.18

49.31

5.13

1.75

0.30

0.06

0.21

#

44.18

44.80

0.62

3.47

0.05

0.20

0.29

#

44.80

45.15

0.35

4.51

0.05

See all Gungnir Resources Inc. news