SouthGobi Announces Fourth Quarter and Full Year 2024 Financial and Operating Results

HONG KONG, CHINA / ACCESS Newswire / March 28, 2025 / SouthGobi Resources Ltd. (Hong Kong Stock Exchange ("HKEX"): 1878, TSX Venture Exchange ("TSX-V"): SGQ) (the "Company" or "SouthGobi") today announces its financial and operating results for the quarter and year ended December 31, 2024. All figures are in U.S. dollars ("USD") unless otherwise stated.

The Board of Directors (the "Board") wish to inform that the Company's independent auditors, BDO Limited, have completed their audit of the consolidated financial statements of the Company for the year ended December 31, 2024 in accordance with Canadian generally accepted auditing standards and would like to announce the audited annual results of the Company for the year ended December 31, 2024 together with the comparative figures for the previous year and the respective notes in this announcement.

Significant Events and Highlights

The Company's significant events and highlights for the year ended December 31, 2024 and the subsequent period to March 28, 2025 are as follows:

  • Operating Results - The Company increased the scale of its mining operations in 2024, as well as implementing various coal processing methods, including screening, wet washing and dry coal processing, which have resulted in improved coal quality and enhanced production volume and growth of coal export volume into China during the year.

    In response to the market demand for different coal products, the Company focused on expanding the categories of coal products in its portfolio, including mixed coal, wet washed coal and dry processed coal. In addition, the Company has experienced success with processing its inventory of F-grade coal products through cost-effective screening procedures. As a result of the improvement in the quality of the processed F-grade coal, the Company was able to meet the import coal quality standards established by Chinese authorities and has been exporting this product to China for sale since the first quarter of 2024, further enhancing the Company's coal export volume.

    The Company recorded sales volume of 7.0 million tonnes in 2024 compared to 3.6 million tonnes in 2023, while the Company recorded an average realised selling price of $70.4 per tonne in 2024 compared to $93.0 per tonne in 2023. The decrease in the average realised selling price was mainly due to the Company facing headwinds in the China coal market in 2024, leading to the Company changing its product mix to sell a greater percentage of lower-priced coal products.

  • Financial Results - The Company recorded a $153.9 million profit from operations in 2024 compared to $75.9 million profit from operations in 2023. The financial results for 2024 were impacted by the expansion of its sales network and diversification of its customer base, and a reversal of additional tax and tax penalty of $48.5 million, which was recorded in the fourth quarter of 2024.

  • Build-Operate-Transfer Agreement - On July 15, 2024, the Company's wholly-owned Mongolian subsidiary, Southgobi Sands LLC ("SGS"), entered into a Build-Operate-Transfer agreement (the "BOT Agreement") with Tangshan Shenzhou Manufacturing Group Co., Ltd ("Tangshan"), pursuant to which Tangshan will be responsible for the construction, operation, and quality management of a new dry coal separation system, including key machinery (collectively, the "Dry Coal Separation System") at the Company's Ovoot Tolgoi Mine in Mongolia, which will be a stand-alone plant separate from the Company's existing dry processing plant. Tangshan will also be responsible for the construction of all related facilities for the Dry Coal Separation System. Under the BOT Agreement, SGS has the right to supervise and manage the overall work of coal quality assurance and operation, including, but not limited to, the supervision and management of operational safety, production planning, and operations management.

The total consideration payable by the Company over the term of the BOT Agreement is approximately $10.9 million, together with certain additional processing volume-based fees. Subject to the terms as set out therein, the BOT Agreement is effective from July 15, 2024 until October 1, 2029.

  • Additional Tax and Tax Penalty Imposed by the Mongolian Tax Authority ("MTA") - On July 18, 2023, SGS received an official notice (the "Notice") issued by the MTA stating that the MTA had completed a periodic tax audit (the "Audit") on the financial information of SGS for the tax assessment years between 2017 and 2020, including transfer pricing, royalty, air-pollution fee and unpaid tax payables. As a result of the Audit, the MTA notified SGS that it is imposing a tax penalty against SGS in the amount of approximately $75.0 million. The penalty mainly relates to the different view on the interpretation of tax law between the Company and the MTA. Under Mongolian law, the Company had a period of 30 days from the date of receipt of the Notice to file an appeal in relation to the Audit. Subsequently the Company engaged an independent tax consultant in Mongolia to provide tax advice and support to the Company and filed an appeal letter in relation to the Audit with the MTA in accordance with Mongolian laws on August 17, 2023.

    On February 8, 2024, SGS received notice from the Tax Dispute Resolution Council ("TDRC") which stated that, after the TDRC's review, the TDRC issued a decision in relation to SGS' appeal of the Audit, and ordered that the audit assessments set forth in the Notice of July 18, 2023 be sent back to the MTA for review and re-assessment.

    On February 22, 2024, SGS received another notice from the MTA stating that the MTA anticipated commencing the re-assessment process on or about March 7, 2024 and the duration of such process will be approximately 45 working days.

    On May 15, 2024, SGS received a notice (the "Revised Notice") from the MTA regarding the re-assessment result on the Audit (the "Re-assessment Result"). The re-assessed amount of the tax penalty is approximately $80.0 million. In accordance with applicable Mongolian laws, SGS is entitled to file an appeal to the TDRC regarding the Re-assessment Result within a 30-day period from the date

    of receiving the Revised Notice.

    On June 12, 2024, following consultation with its independent tax consultant in Mongolia, SGS submitted an appeal letter to the TDRC regarding the Re-assessment Result, in accordance with applicable Mongolian laws.

    On January 10, 2025, SGS received a resolution dated December 19, 2024 (the "Resolution") from the TDRC in response to the appeal letter sent by SGS to the TDRC on June 12, 2024, relating to the Re-assessment Result. As set forth in the Resolution, the TDRC has determined to reduce the re-assessed amount of tax penalty against SGS from approximately $80.0 million to approximately $26.5 million (the "Revised Re-assessment Result"). In accordance with the applicable Mongolian laws, SGS is entitled to file an appeal to the Administrative Court in Ulaanbaatar, Mongolia (the "Administrative Court") regarding the Revised Re-assessment Result within a 30-day period from the date of receiving the Resolution. After careful consideration and consultation with the Company's independent tax consultant in Mongolia, the Company has determined not to pursue a further appeal of the Revised Re-assessment Result with the Administrative Court.

    As at December 31, 2024, the Company recorded an additional tax and tax penalty in the amount of $45.5 million (2023: $85.1 million), which consists of a tax penalty payable of $26.5 million (2023: $75.0 million) and a provision for additional late tax penalty of $19.0 million (2023: $10.1 million). As a result of the Revised Re-assessment Result, the Company recorded a reversal of additional tax and tax penalty of $48.5 million in 2024 (2023: $nil). To date, the Company has paid the MTA an aggregate of $1.7 million in relation to the aforementioned tax penalty. The Company anticipates paying down the outstanding amount of the tax and tax penalty from cash generated from operations in the normal course. According to Mongolian tax law, the Mongolian tax authority has a legal authority to demand payment of the outstanding amount of the Revised Re-assessment Result from the Company at its discretion.

  • 2025 March Deferral Agreement - On March 20, 2025, the Company and JD Zhixing Fund L.P. ("JDZF") entered into an agreement (the "2025 March Deferral Agreement") pursuant to which JDZF agreed to grant the Company a deferral of (i) the cash and payment-in-kind interest ("PIK Interest"), management fees, and related deferral fees in the aggregate amount of approximately $111.6 million which will be due and payable to JDZF on or before August 31, 2025 pursuant to the deferral agreement dated March 19, 2024 and the deferral agreement dated April 30, 2024; (ii) semi-annual cash interest payment of approximately $7.9 million payable to JDZF on May 19, 2025 under the Convertible Debenture; (iii) semi-annual cash interest payments of approximately $8.1 million payable to JDZF on November 19, 2025 and the $4.0 million in PIK Interest payable to JDZF on November 19, 2025 under the JDZF convertible debenture (the "Convertible Debenture"); and (iv) management fees in the aggregate amount of approximately $6.1 million payable to JDZF on May 16, 2025, August 15, 2025, November 15, 2025 and February 15, 2026, respectively, under the amended and restated mutual cooperation agreement (the "Amended and Restated Cooperation Agreement") (collectively, the "2025 March Deferred Amounts").

    The effectiveness of the 2025 March Deferral Agreement and the respective covenants, agreements and obligations of each party under the 2025 March Deferral Agreement are subject to the Company obtaining the requisite approval of the 2025 March Deferral Agreement from shareholders in accordance with the requirements of applicable Canadian securities laws and Rule 14.33 and Rule 14A.36 of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited (the "Listing Rules"). The Company will be seeking approval of the 2025 March Deferral Agreement from disinterested shareholders at the Company's upcoming annual general meeting ("AGM") of shareholders, which will be held at a future date to be set by the Board.

    The principal terms of the 2025 March Deferral Agreement are as follows:

  • Payment of the 2025 March Deferred Amounts will be deferred until August 31, 2026 (the "2025 March Deferral Agreement Deferral Date").

  • As consideration for the deferral of the 2025 March Deferred Amounts which relate to the payment obligations arising from the Convertible Debenture, the Company agreed to pay JDZF a deferral fee equal to 6.4% per annum on the outstanding balance of such 2025 March Deferred Amounts, commencing on the date on which each such 2025 March Deferred Amounts would otherwise have been due and payable under the Convertible Debenture.

  • As consideration for the deferral of the 2025 March Deferred Amounts which relate to payment obligations arising from the Amended and Restated Cooperation Agreement, the Company agreed to pay JDZF a deferral fee equal to 1.5% per annum on the outstanding balance of such 2025 March Deferred Amounts commencing on the date on which each such 2025 March Deferred Amounts would otherwise have been due and payable under the Amended and Restated Cooperation Agreement.

  • The 2025 March Deferral Agreement does not contemplate a fixed repayment schedule for the 2025 March Deferred Amounts or related deferral fees. Instead, the 2025 March Deferral Agreement requires the Company to use its best efforts to pay the 2025 March Deferred Amounts and related deferral fees due and payable under the 2025 March Deferral Agreement to JDZF. During the period beginning as of the effective date of the 2025 March Deferral Agreement and ending as of the 2025 March Deferral Agreement Deferral Date, the Company will provide JDZF with monthly updates of its financial status and business operations, and the Company and JDZF will on a monthly basis discuss and assess in good faith the amount (if any) of the 2025 March Deferred Amounts and related deferral fees that the Company may be able to repay to JDZF, having regard to the working capital requirements of the Company's operations and business at such time and with the view of ensuring that the Company's operations and business would not be materially prejudiced as a result of any repayment.

  • If at any time before the 2025 March Deferred Amounts and related deferral fees are fully repaid, the Company proposes to appoint, replace or terminate one or more of its chief executive officer, its chief financial officer or any other senior executive(s) in charge of its principal business function or its principal subsidiary, the Company will first consult with, and obtain written consent (such consent shall not be unreasonably withheld) from JDZF prior to effecting such appointment, replacement or termination.

  • Changes in Directors and Management

Ms. Chonglin Zhu: Ms. Zhu was appointed as Chief Financial Officer on February 2, 2024.

Mr. Alan Ho: Mr. Ho was redesignated from Chief Financial Officer to a new management position within the Company on February 2, 2024.

Mr. Fan Keung Vic Choi: Mr. Choi was elected as an independent non-executive director at the Company's AGM held on June 27, 2024.

Mr. Mao Sun: Mr. Sun did not stand for the re-election at the AGM and ceased to be an independent non-executive director on June 27, 2024.

  • Going Concern - Several adverse conditions and material uncertainties relating to the Company cast significant doubt upon the going concern assumption which includes the deficiencies in assets and working capital.

See section "Liquidity and Capital Resources" of this press release for details.

OVERVIEW OF OPERATIONAL DATA AND FINANCIAL RESULTS

Summary of Annual Operational Data

  1. A Non-International Financial Reporting Standards ("non-IFRS") financial measure. Refer to "Non-IFRS Financial Measures" section. Cash costs of product sold exclude idled mine asset cash costs.

  2. Per 200,000 man hours and calculated based on a rolling 12 month average.

Overview of Annual Operational Data

The Company recorded an average realised selling price of $70.4 per tonne for 2024 compared to $93.0 per tonne for 2023. The decrease was mainly due to the Company facing headwinds in the China coal market in 2024, leading to the Company changing its product mix to sell a greater percentage of lower-priced coal products. The product mix for 2024 consisted of approximately 13% of premium semi-soft coking coal, 42% of standard semi-soft coking coal/premium thermal coal, 12% of standard thermal coal and 33% of processed coal compared to approximately 58% of premium semi-soft coking coal, 15% of standard semi-soft coking coal/premium thermal coal and 27% of processed coal in 2023.

The Company's unit cost of sales of product sold was $51.4 per tonne in 2024 compared to $44.1 per tonne in 2023. The increase was due to change in product mix with the Company expanding into certain categories of processed coal with higher production costs.

Summary of Annual Financial Results

  1. Revenue and cost of sales related to the Company's Ovoot Tolgoi Mine within the Coal Division operating segment. Refer to note 3 of the selected information from the notes to the consolidated financial statements in this press release for further analysis regarding the Company's reportable operating segments.

  2. A non-IFRS financial measure, idled mine asset costs represents the depreciation expense relates to the Company's idled plant and equipment.

Overview of Annual Financial Results

The Company recorded a $153.9 million profit from operations in 2024 compared to $75.9 million profit from operations in 2023. The increase was mainly due to an increase of 3.4 million tonnes of sales volume in 2024 as compared to 2023 and a reversal of additional tax and tax penalty of $48.5 million was recorded in the fourth quarter of 2024.

Revenue was $493.4 million in 2024 compared to $331.5 million in 2023. The financial results were impacted by increased sales volume, as a result of expansion of its sales network, diversification of its customer baseand expansion of the categories of coal products in its portfolio.

Cost of sales was $360.6 million in 2024 compared to $158.2 million in 2023. The increase in cost of sales was mainly due to increased sales and the Company expanding into certain categories of processed coal with higher production costs.

Cost of sales consists of operating expenses, share-based compensation expense, equipment depreciation, depletion of mineral properties, royalties and idled mine asset costs. Operating expenses in cost of sales reflect the total cash costs of product sold (a Non-IFRS financial measure, refer to "Non-IFRS Financial Measures" section of this press release for further analysis) during the year.

Operating expenses in cost of sales were $288.8 million in 2024 compared to $114.3 million in 2023. The overall increase in operating expenses was due to the Company expanding into certain categories of processed coal with higher production costs.

Cost of sales related to idled mine assets in 2024 included $0.5 million related to depreciation expenses for idled equipment (2023: $0.2 million).

Other operating expenses were $3.7 million in 2024 (2023: $0.9 million). The increase was due to increased management fee in 2024 and no reversal of impairment on materials and supplies inventories was recorded in 2024 (2023: $5.0 million).

Administration expenses were $13.5 million in 2024 as compared to $10.4 million in 2023. The change was mainly due to higher daily administration fees and increased salaries and benefits as a result of expansion of operations.

The Company continued to minimise evaluation and exploration expenditures in 2024 in order to preserve the Company's financial resources. Evaluation and exploration activities and expenditures in 2024 were limited to ensuring that the Company met the Mongolian Minerals Law requirements in respect of its mining licenses.

Finance costs were $37.8 million and $49.1 million in 2024 and 2023 respectively, which primarily consisted of interest expense on the $250.0 million Convertible Debenture.

Summary of Quarterly Operational Data

  1. A non-IFRS financial measure. Refer to section "Non-IFRS Financial Measures". Cash costs of product sold exclude idled mine asset cash costs.

  2. Per 200,000 man hours and calculated based on a rolling 12 month average.

Overview of Quarterly Operational Data

The Company experienced a decrease in the average selling price of coal from $92.9 per tonne in the fourth quarter of 2023 to $65.7 per tonne in the fourth quarter of 2024, as a result of the Company facing headwinds in the China coal market in 2024, leading to the Company changing its product mix to sell a greater percentage of lower-priced coal products. The product mix for the fourth quarter of 2024 consisted of approximately 6% premium semi-soft coking coal, 49% standard semi-soft coking coal/premium thermal coal, 14% standard thermal coal and 31% of processed coal compared to approximately 56% premium semi-soft coking coal, 30% standard semi-soft coking coal/premium thermal coal and 14% of processed coal in the fourth quarter of 2023.

The Company sold 2.7 million tonnes for the fourth quarter of 2024, compared to 1.0 million tonnes for the fourth quarter of 2023.

The Company's unit cost of sales of product sold increased from $38.2 per tonne in the fourth quarter of 2023 to $48.9 per tonne in the fourth quarter of 2024. The increase was mainly due to the Company expanding into certain categories of processed coal with higher production costs.

Summary of Quarterly Financial Results

The Company's annual financial statements are reported under the IFRS Accounting Standards issued by the International Accounting Standards Board ("IASB") ("IFRS Accounting Standards"). The following table provides highlights, extracted from the Company's annual and interim consolidated financial statements, of quarterly results for the past eight quarters.

  1. Revenue and cost of sales relate to the Company's Ovoot Tolgoi Mine within the Coal Division operating segment. Refer to note 3 of the selected information from the notes to the consolidated financial statements in this press release for further analysis regarding the Company's reportable operating segments.

  2. A non-IFRS financial measure, idled mine asset costs represents the depreciation expense relates to the Company's idled plant and equipment.

Overview of Quarterly Financial Results

The Company recorded a $79.1 million profit from operations in the fourth quarter of 2024 compared to a $42.0 million profit from operations in the fourth quarter of 2023. The financial results for the fourth quarter of 2024 were impacted by the Company recording a reversal of additional tax and tax penalty of $48.5 million during the quarter as a result of the Revised Re-assessment Result.

Revenue was $174.6 million in the fourth quarter of 2024 compared to $88.5 million in the fourth quarter of 2023. The increase was due to: increased sales volume, as a result of expansion of its sales network, diversification of its customer base and expansion of the categories of coal products in its portfolio.

Cost of sales was $130.1 million in the fourth quarter of 2024 compared to $36.6 million in the fourth quarter of 2023. The increase in cost of sales in the fourth quarter of 2024 was mainly due to increased sales and the Company expanding into certain categories of processed coal with higher production costs.

Cost of sales consists of operating expenses, share-based compensation expense, equipment depreciation, depletion of mineral properties, royalties and idled mine asset costs. Operating expenses in cost of sales reflect the total cash costs of product sold (a Non-IFRS financial measure, refer to section "Non-IFRS Financial Measures" for further analysis) during the quarter.

Cost of sales related to idled mine assets in the fourth quarter of 2024 included $0.2 million related to depreciation expenses for idled equipment (fourth quarter of 2023: $0.1 million).

Other operating expenses were $1.2 million in the fourth quarter of 2024 (fourth quarter of 2023: other operating income of $4.3 million). A gain on a contract offsetting arrangement of $2.6 million was recorded and offset by management fee of $2.3 million and foreign exchange loss of $1.1 million in the fourth quarter of 2024 (fourth quarter of 2023: reversal of impairment on materials and supplies inventories of $4.7 million and gain on a contract offsetting arrangement of $0.7 million were recorded and offset by management fee of $1.2 million).

Administration expenses were $3.6 million in the fourth quarter of 2024 compared to $3.9 million in the fourth quarter of 2023.

The Company continued to minimise evaluation and exploration expenditures in the fourth quarter of 2024 in order to preserve the Company's financial resources. Evaluation and exploration activities and expenditures in the fourth quarter of 2024 were limited to ensuring that the Company met the Mongolian Minerals Law requirements in respect of its mining licenses.

Finance costs were $6.9 million in the fourth quarter of 2024 compared to $12.3 million in the fourth quarter of 2023, which primarily consisted of interest expense on the $250.0 million Convertible Debenture.

LIQUIDITY AND CAPITAL RESOURCES

Liquidity and Capital Management

The Company has in place a planning, budgeting and forecasting process to help determine the funds required to support the Company's normal operations on an ongoing basis and the Company's expansionary plans.

Costs reimbursable to Turquoise Hill Resources Limited ("Turquoise Hill")

Prior to the completion of a private placement with Novel Sunrise Investments Limited on April 23, 2015, Rio Tinto plc ("Rio Tinto") was the Company's ultimate parent company. In the past, Rio Tinto sought reimbursement from the Company for the salaries and benefits of certain Rio Tinto employees who were assigned by Rio Tinto to work for the Company, as well as certain legal and professional fees incurred by Rio Tinto in relation to the Company's prior internal investigation and Rio Tinto's participation in the tripartite committee. Subsequently Rio Tinto transferred and assigned to Turquoise Hill its right to seek reimbursement for these costs and fees from the Company.

On January 20, 2021, the Company and Turquoise Hill entered into a settlement agreement, whereby Turquoise Hill agreed to a repayment schedule in settlement of certain secondment costs in the amount of $2.8 million (representing a portion of the TRQ Reimbursable Amount) pursuant to which the Company agreed to make monthly payments to Turquoise Hill in the amount of $0.1 million per month from January 2021 to June 2022. The Company is contesting the validity of the remaining balance of the TRQ Reimbursable Amount claimed by Turquoise Hill.

As at December 31, 2024, the amount of reimbursable costs and fees claimed by Turquoise Hill (the "TRQ Reimbursable Amount") amounted to $6.3 million (such amount is included in the trade and other payables).

Additional tax and tax penalty imposed by the MTA

On July 18, 2023, SGS received the Notice issued by the MTA stating that the MTA had completed the Audit on the financial information of SGS for the tax assessment years between 2017 and 2020, including transfer pricing, royalty, air-pollution fee and unpaid tax payables. As a result of the Audit, the MTA notified SGS that it is imposing a tax penalty against SGS in the amount of approximately $75.0 million. The penalty mainly relates to the different view on the interpretation of tax law between the Company and the MTA. Under Mongolian law, the Company had a period of 30 days from the date of receipt of the Notice to file an appeal in relation to the Audit. Subsequently the Company engaged an independent tax consultant in Mongolia to provide tax advice and support to the Company and filed an appeal letter in relation to the Audit with the MTA in accordance with Mongolian laws on August 17, 2023.

On February 8, 2024, SGS received notice from the TDRC which stated that, after the TDRC's review, the TDRC issued a decision in relation to SGS' appeal of the Audit, and ordered that the audit assessments set forth in the Notice of July 18, 2023 be sent back to the MTA for review and re-assessment.

On February 22, 2024, SGS received another notice from the MTA stating that the MTA anticipated commencing the re-assessment process on or about March 7, 2024 and the duration of such process will be approximately 45 working days.

On May 15, 2024, SGS received the Revised Notice from the MTA regarding the Re-assessment Result. The re-assessed amount of the tax penalty is approximately $80.0 million. In accordance with applicable Mongolian laws, SGS is entitled to file an appeal to the TDRC regarding the Re-assessment Result within a 30-day period from the date of receiving the Revised Notice.

On June 12, 2024, following consultation with its independent tax consultant in Mongolia, SGS submitted an appeal letter to the TDRC regarding the Re-assessment Result, in accordance with applicable Mongolian laws.

On January 10, 2025, SGS received the Resolution from the TDRC in response to the appeal letter sent by SGS to the TDRC on June 12, 2024, relating to the Re-assessment Result. As set forth in the Resolution, the TDRC has determined to reduce the re-assessed amount of tax penalty against SGS from approximately $80.0 million to approximately $26.5 million. In accordance with the applicable Mongolian laws, SGS is entitled to file an appeal to the Administrative Court regarding the Revised Re-assessment Result within a 30-day period from the date of receiving the Resolution. After careful consideration and consultation with the Company's independent tax consultant in Mongolia, the Company has determined not to pursue a further appeal of the Revised Re-assessment Result with the Administrative Court.

As at December 31, 2024, the Company recorded an additional tax and tax penalty in the amount of $45.5 million (2023: $85.1 million), which consists of a tax penalty payable of $26.5 million (2023: $75.0 million) and a provision for additional late tax penalty of $19.0 million (2023: $10.1 million). As a result of the Revised Re-assessment Result, the Company recorded a reversal of additional tax and tax penalty of $48.5 million in 2024 (2023: $nil). To date, the Company has paid the MTA an aggregate of $1.7 million in relation to the aforementioned tax penalty. The Company anticipates paying down the outstanding amount of the tax and tax penalty from cash generated from operations in the normal course. According to Mongolian tax law, the Mongolian tax authority has a legal authority to demand payment of the outstanding amount of the Revised Re-assessment Result from the Company at its discretion.

Going concern considerations

The Company's consolidated financial statements have been prepared on a going concern basis which assumes that the Company will continue to operate until at least December 31, 2025 and will be able to realise its assets and discharge its liabilities in the normal course of operations as they come due. However, in order to continue as a going concern, the Company must generate sufficient operating cash flows, secure additional capital or otherwise pursue a strategic restructuring, refinancing or other transactions to provide it with sufficient liquidity.

Several adverse conditions and material uncertainties cast significant doubt upon the Company's ability to continue as a going concern and the going concern assumption used in the preparation of the Company's consolidated financial statements. The Company had a deficiency in assets of $49.8 million as at December 31, 2024 as compared to a deficiency in assets of $141.3 million as at December 31, 2023 while the working capital deficiency (excess current liabilities over current assets) reached $228.1 million as at December 31, 2024 compared to a working capital deficiency of $218.8 million as at December 31, 2023.

Included in the working capital deficiency as at December 31, 2024 are significant obligations, represented by trade and other payables of $169.3 million and the additional tax and tax penalty of $43.8 million.

The Company may not be able to settle all trade and other payables on a timely basis, and as a result any continuing postponement in settling of certain trade and other payables owed to suppliers and creditors may result in potential lawsuits and/or bankruptcy proceedings being filed against the Company. Except as disclosed elsewhere in this press release, no such lawsuits or proceedings were pending as at March 28, 2025. However, there can be no assurance that no such lawsuits or proceedings will be filed by the Company's creditors in the future and the Company's suppliers and contractors will continue to supply and provide services to the Company uninterrupted.

There are significant uncertainties as to the outcomes of the above events or conditions that may cast significant doubt on the Company's ability to continue as a going concern and, therefore, the Company may be unable to realise its assets and discharge its liabilities in the normal course of business. Should the use of the going concern basis in preparation of the consolidated financial statements be determined to be not appropriate, adjustments would have to be made to write down the carrying amounts of the Company's assets to their realisable values, to provide for any further liabilities which might arise and to reclassify non-current assets and non-current liabilities as current assets and current liabilities, respectively. The effects of these adjustments have not been reflected in the consolidated financial statements. If the Company is unable to continue as a going concern, it may be forced to seek relief under applicable bankruptcy and insolvency legislation.

For the purpose of assessing the appropriateness of the use of the going concern basis to prepare the financial statements, management of the Company has prepared a cash flow projection covering a period of 12 months from December 31, 2024. The cash flow projection has considered the anticipated cash flows to be generated from the Company's business during the period under projection including cost saving measures. In particular, the Company has taken into account the following measures for improvement of the Company's liquidity and financial position, which include: (a) entering into the 2025 March Deferral Agreement on March 20, 2025 for a deferral of the 2025 March Deferred Amounts; (b) communicating with vendors in agreeing repayment plans of the outstanding payable; and (c) obtaining an avenue of financial support from an affiliate of the Company's major shareholder for a maximum amount of $127.0 million (equivalent to RMB 900 million) during the period covered in the cash flow projection. Regarding these plans and measures, there is no guarantee that the suppliers would agree the settlement plan as communicated by the Company. Nevertheless, after considering the above, the directors of the Company believe that there will be sufficient financial resources to continue its operations and to meet its financial obligations as and when they fall due in the next 12 months from December 31, 2024 and therefore are satisfied that it is appropriate to prepare the consolidated financial statements on a going concern basis.

Significant uncertainties exist regarding the Company's management's ability to achieve its plans as described above. The continued operation of the Company as a going concern depends on a key factor: the utilisation of the financial support from an affiliate of the Company's major shareholder to settle payables, including the additional tax and tax penalty, in a timely manner.

The outcome of this factor will have a significant impact on the Company's ability to continue operating as a going concern. It is crucial to closely monitor and address these uncertainties to ensure the Company's stability and long-term viability.

Factors that impact the Company's liquidity are being closely monitored and include, but are not limited to, restrictions on the Company's ability to import its coal products for sale in China, Chinese economic growth, market prices of coal, production levels, operating cash costs, capital costs, exchange rates of currencies of countries where the Company operates and exploration and discretionary expenditures.

As at December 31, 2024 and December 31, 2023, the Company was not subject to any externally imposed capital requirements.

Convertible Debenture

In November 2009, the Company entered into a financing agreement with China Investment Corporation (together with its wholly-owned subsidiaries and affiliates, "CIC") for $500 million in the form of a secured, convertible debenture bearing interest at 8.0% (6.4% payable semi-annually in cash and 1.6% payable annually in the Company's Common Shares) with a maximum term of 30 years. The Convertible Debenture is secured by a first ranking charge over the Company's assets, including shares of its material subsidiaries. The financing was used primarily to support the accelerated investment program in Mongolia and for working capital, repayment of debts, general and administrative expenses and other general corporate purposes.

On March 29, 2010, the Company exercised its right to call for the conversion of up to $250.0 million of the Convertible Debenture into approximately 21.5 million shares at a conversion price of $11.64 (CA$11.88).

Deferral Agreements

On March 19, 2024, the Company and JDZF entered into an agreement (the "2024 March Deferral Agreement") pursuant to which JDZF agreed to grant the Company a deferral of (i) the cash and PIK Interest, management fees, and related deferral fees in the aggregate amount of approximately $96.5 million due and payable to JDZF on or before August 31, 2024 pursuant to certain prior deferral agreements dated March 24, 2023 and October 13, 2023; (ii) semi-annual cash interest payment of approximately $7.9 million payable to JDZF on May 19, 2024 under the Convertible Debenture; (iii) semi-annual cash interest payments of approximately $8.1 million payable to JDZF on November 19, 2024 and the $4.0 million in PIK Interest payable to JDZF on November 19, 2024 under the Convertible Debenture; and (iv) management fees in the aggregate amount of $2.2 million payable to JDZF on November 15, 2024 and February 15, 2025, respectively, under the Amended and Restated Cooperation Agreement (collectively, the "2024 March Deferred Amounts").

The effectiveness of the 2024 March Deferral Agreement and the respective covenants, agreements and obligations of each party under the 2024 March Deferral Agreement are subject to the Company obtaining the requisite approval of the 2024 March Deferral Agreement from shareholders in accordance with the requirements of applicable Canadian securities laws and Rule 14.33 and Rule 14A.36 of the Listing Rules. The 2024 March Deferral Agreement was approved by the Company's disinterested shareholders through a special meeting of shareholders convened on August 28, 2024.

The principal terms of the 2024 March Deferral Agreement are as follows:

  • Payment of the 2024 March Deferred Amounts are deferred until August 31, 2025 (the" 2024 March Deferral Agreement Deferral Date").

  • As consideration for the deferral of the 2024 March Deferred Amounts which relate to the payment obligations arising from the Convertible Debenture, the Company agreed to pay JDZF a deferral fee equal to 6.4% per annum on the outstanding balance of such 2024 March Deferred Amounts, commencing on the date on which each such 2024 March Deferred Amounts would otherwise have been due and payable under the Convertible Debenture.

  • As consideration for the deferral of the 2024 March Deferred Amounts which relate to payment obligations arising from the Amended and Restated Cooperation Agreement, the Company agreed to pay JDZF a deferral fee equal to 1.5% per annum on the outstanding balance of such 2024 March Deferred Amounts commencing on the date on which each such 2024 March Deferred Amounts would otherwise have been due and payable under the Amended and Restated Cooperation Agreement.

  • The 2024 March Deferral Agreement does not contemplate a fixed repayment schedule for the 2024 March Deferred Amounts or related deferral fees. Instead, the 2024 March Deferral Agreement requires the Company to use its best efforts to pay the 2024 March Deferred Amounts and related deferral fees due and payable under the 2024 March Deferral Agreement to JDZF. During the period beginning as of the effective date of the 2024 March Deferral Agreement and ending as of the 2024 March Deferral Agreement Deferral Date, the Company will provide JDZF with monthly updates of its financial status and business operations, and the Company and JDZF will on a monthly basis discuss and assess in good faith the amount (if any) of the 2024 March Deferred Amounts and related deferral fees that the Company may be able to repay to JDZF, having regard to the working capital requirements of the Company's operations and business at such time and with the view of ensuring that the Company's operations and business would not be materially prejudiced as a result of any repayment.

  • If at any time before the 2024 March Deferred Amounts and related deferral fees are fully repaid, the Company proposes to appoint, replace or terminate one or more of its chief executive officer, its chief financial officer or any other senior executive(s) in charge of its principal business function or its principal subsidiary, the Company will first consult with, and obtain written consent (such consent shall not be unreasonably withheld) from JDZF prior to effecting such appointment, replacement or termination.

On April 30, 2024, the Company and JDZF entered into an agreement (the "2024 April Deferral Agreement") pursuant to which JDZF agreed to grant the Company a deferral of the remaining $1.1 million of PIK interest which was payable on November 19, 2022 under the Convertible Debenture, the payment of which was deferred pursuant to a certain prior deferral agreement dated November 11, 2022 (the "November 2022 Deferral Agreement") until November 19, 2023, as well as related deferral fees under the November 2022 Deferral Agreement (collectively, the "2024 April Deferred Amounts").

The effectiveness of the 2024 April Deferral Agreement and the respective covenants, agreements and obligations of each party under the 2024 April Deferral Agreement are subject to the Company obtaining the requisite approval of the 2024 April Deferral Agreement from shareholders in accordance with the requirements of applicable Canadian securities laws and Rule 14.33 and Rule 14A.36 of the Listing Rules. The 2024 April Deferral Agreement was approved by the Company's disinterested shareholders through a special meeting of shareholders convened on August 28, 2024.

The principal terms of the 2024 April Deferral Agreement are as follows:

  • Payment of the 2024 April Deferred Amounts are deferred until August 31, 2025 (the" 2024 April Deferral Agreement Deferral Date").

  • As consideration for the deferral of the 2024 April Deferred Amounts, the Company agreed to pay JDZF a deferral fee equal to 6.4% per annum on the outstanding balance of such 2024 April Deferred Amounts, commencing on the date on which each such 2024 April Deferred Amounts would otherwise have been due and payable under the Convertible Debenture.

  • The 2024 April Deferral Agreement does not contemplate a fixed repayment schedule for the 2024 April Deferred Amounts or related deferral fees. Instead, the 2024 April Deferral Agreement requires the Company to use its best efforts to pay the 2024 April Deferred Amounts and related deferral fees due and payable under the 2024 April Deferral Agreement to JDZF. During the period beginning as of the effective date of the 2024 April Deferral Agreement and ending as of the 2024 April Deferral Agreement Deferral Date, the Company will provide JDZF with monthly updates of its financial status and business operations, and the Company and JDZF will on a monthly basis discuss and assess in good faith the amount (if any) of the 2024 April Deferred Amounts and related deferral fees that the Company may be able to repay to JDZF, having regard to the working capital requirements of the Company's operations and business at such time and with the view of ensuring that the Company's operations and business would not be materially prejudiced as a result of any repayment.

  • If at any time before the 2024 April Deferred Amounts and related deferral fees are fully repaid, the Company proposes to appoint, replace or terminate one or more of its chief executive officer, its chief financial officer or any other senior executive(s) in charge of its principal business function or its principal subsidiary, the Company will first consult with, and obtain written consent (such consent shall not be unreasonably withheld) from JDZF prior to effecting such appointment, replacement or termination.

On March 20, 2025, the Company and JDZF entered into the 2025 March Deferral Agreement pursuant to which JDZF agreed to grant the Company a deferral of (i) the cash and PIK Interest, management fees, and related deferral fees in the aggregate amount of approximately $111.6 million which will be due and payable to JDZF on or before August 31, 2025 pursuant to the 2024 March Deferral Agreement and the 2024 April Deferral Agreement; (ii) semi-annual cash interest payment of approximately $7.9 million payable to JDZF on May 19, 2025 under the Convertible Debenture; (iii) semi-annual cash interest payments of approximately $8.1 million payable to JDZF on November 19, 2025 and the $4.0 million in PIK Interest payable to JDZF on November 19, 2025 under the Convertible Debenture; and (iv) management fees in the aggregate amount of approximately $6.1 million payable to JDZF on May 16, 2025, August 15, 2025, November 15, 2025 and February 15, 2026, respectively, under Amended and Restated Cooperation Agreement (collectively, the "2025 March Deferred Amounts").

The effectiveness of the 2025 March Deferral Agreement and the respective covenants, agreements and obligations of each party under the 2025 March Deferral Agreement are subject to the Company obtaining the requisite approval of the 2025 March Deferral Agreement from shareholders in accordance with the requirements of applicable Canadian securities laws and Rule 14.33 and Rule 14A.36 of the Listing Rules. The Company will be seeking approval of the 2025 March Deferral Agreement from disinterested shareholders at the Company's upcoming AGM of shareholders, which will be held at a future date to be set by the Board.

The principal terms of the 2025 March Deferral Agreement are as follows:

  • Payment of the 2025 March Deferred Amounts will be deferred until the 2025 March Deferral Agreement Deferral Date.

  • As consideration for the deferral of the 2025 March Deferred Amounts which relate to the payment obligations arising from the Convertible Debenture, the Company agreed to pay JDZF a deferral fee equal to 6.4% per annum on the outstanding balance of such 2025 March Deferred Amounts, commencing on the date on which each such 2025 March Deferred Amounts would otherwise have been due and payable under the Convertible Debenture.

  • As consideration for the deferral of the 2025 March Deferred Amounts which relate to payment obligations arising from the Amended and Restated Cooperation Agreement, the Company agreed to pay JDZF a deferral fee equal to 1.5% per annum on the outstanding balance of such 2025 March Deferred Amounts commencing on the date on which each such 2025 March Deferred Amounts would otherwise have been due and payable under the Amended and Restated Cooperation Agreement.

  • The 2025 March Deferral Agreement does not contemplate a fixed repayment schedule for the 2025 March Deferred Amounts or related deferral fees. Instead, the 2025 March Deferral Agreement requires the Company to use its best efforts to pay the 2025 March Deferred Amounts and related deferral fees due and payable under the 2025 March Deferral Agreement to JDZF. During the period beginning as of the effective date of the 2025 March Deferral Agreement and ending as of the 2025 March Deferral Agreement Deferral Date, the Company will provide JDZF with monthly updates of its financial status and business operations, and the Company and JDZF will on a monthly basis discuss and assess in good faith the amount (if any) of the 2025 March Deferred Amounts and related deferral fees that the Company may be able to repay to JDZF, having regard to the working capital requirements of the Company's operations and business at such time and with the view of ensuring that the Company's operations and business would not be materially prejudiced as a result of any repayment.

  • If at any time before the 2025 March Deferred Amounts and related deferral fees are fully repaid, the Company proposes to appoint, replace or terminate one or more of its chief executive officer, its chief financial officer or any other senior executive(s) in charge of its principal business function or its principal subsidiary, the Company will first consult with, and obtain written consent (such consent shall not be unreasonably withheld) from JDZF prior to effecting such appointment, replacement or termination.

Amendment of Convertible Debenture

On May 13, 2024, the Company and JDZF entered into an amendment agreement (the "Convertible Debenture Amendment") to amend certain terms of the Convertible Debenture.

Pursuant to the Convertible Debenture Amendment, the Company may, by resolution of the Board of the Company, at any time and from time to time prepay, without penalty, the whole or any part of the principal amount outstanding under the Convertible Debenture, together with accrued cash interest and PIK interest thereon to the date of prepayment, provided that:

  1. the Company has, not later than three (3) business days prior to the proposed prepayment date, delivered to JDZF an irrevocable written notice, signed by an independent director of the Company and setting out the terms of the prepayment;

  2. the amount of such prepayment reduces the then outstanding principal amount under the Convertible Debenture by an amount that is (a) not less than $500,000 and (b) if in excess of $500,000, an integral multiple of $500,000; and

  3. the proposed prepayment date falls on a business day.

The Company did not provide any additional form of consideration to JDZF in connection with the Convertible Debenture Amendment. Aside from the aforementioned amendments, the existing terms of the Convertible Debenture continue in full force and effect and unchanged.

The effectiveness of the Convertible Debenture Amendment is subject to the Company providing notice to, and obtaining acceptance (if required) from the TSX-V and requisite approval from disinterested shareholders of the Company in accordance with the requirements of applicable Canadian securities laws and Listing Rules. The Convertible Debenture Amendment was approved by the Company's disinterested shareholders through a special meeting of shareholders convened on August 28, 2024.

Ovoot Tolgoi Mine Impairment Analysis

The Company determined that an indicator of impairment existed for its Ovoot Tolgoi Mine cash generating unit as at December 31, 2024. The impairment indicator was the uncertainty of future coal price in China.

Therefore, the Company conducted an impairment test whereby the carrying value of the Company's Ovoot Tolgoi Mine cash generating unit was compared to the recoverable amount (being the "fair value less costs of disposal") using a discounted future cash flow valuation model. The Company's cash flow valuation model takes into consideration the latest available information to the Company, including but not limited to, sales prices, sales volumes, washing production, operating costs and life of mine coal production estimates as at December 31, 2024. The carrying value of the Company's Ovoot Tolgoi Mine cash generating unit was $243.6 million as at December 31, 2024.

Key estimates and assumptions incorporated in the valuation model included the following:

  • Coal resources and reserves as estimated by an independent third-party engineering firm;

  • Sales price estimates from an independent market consulting firm;

  • Forecastedsales volumes in line with production levels as reference to the mine plan;

  • Life-of-mine coal production, strip ratio, capital costs and operating costs; and

  • A post-tax discount rate of 16% based on an analysis of the market, country and asset specific factors.

Key sensitivities in the valuation model are as follows:

  • For each 1% increase/(decrease) in the long term price estimates, the calculated fair value of the cash generating unit increases/(decreases) by approximately $17.3/(17.4) million;

  • For each 1% increase/(decrease) in the post-tax discount rate, the calculated fair value of the cash generating unit (decreases)/increases by approximately $(15.2)/16.1 million;

  • For each 1% increase/(decrease) in the cash mining cost estimates, the calculated fair value of the cash generating unit (decreases)/increases by approximately $(9.9)/9.8 million; and

  • For each 1% increase/(decrease) in Mongolian inflation rate, the calculated fair value of the cash generating unit (decreases)/increases by approximately $(32.8)/31.0 million.

The impairment analysis did not result in the identification of an impairment loss or an impairment reversal and no charge or reversal was required as at December 31, 2024. A decline of 2% (2023: 5%) in the long-term price estimates, an increase of more than 3% (2023: 8%) in the post-tax discount rate, an increase of 4% (2023: 10%) in the cash mining cost estimates or an increase of 24% (2023: 41%) in Mongolian inflation rate may trigger an impairment charge on the cash generating unit. The Company believes that the estimates and assumptions incorporated in the impairment analysis are reasonable; however, the estimates and assumptions are subject to significant uncertainties and judgments.

REGULATORY ISSUES AND CONTINGENCIES

Lawsuit

In January 2014, Siskinds LLP, a Canadian law firm, filed a class action (the "Class Action") against the Company, certain of its former senior officers and directors, and its former auditors (the "Former Auditors"), in the Ontario Court in relation to the Company's restatement of certain financial statements previously disclosed in the Company's public fillings (the "Restatement").

To commence and proceed with the Class Action, the plaintiff was required to seek leave of the Court under the Ontario Securities Act ("Leave Motion") and certify the action as a class proceeding under the Ontario Class Proceedings Act. The Ontario Court rendered its decision on the Leave Motion on November 5, 2015, dismissing the action against the former senior officers and directors and allowing the action to proceed against the Company in respect of alleged misrepresentation affecting trades in the secondary market for the Company's securities arising from the Restatement. The action against the Former Auditors was settled by the plaintiff on the eve of the Leave Motion.

Both the plaintiff and the Company appealed the Leave Motion decision to the Ontario Court of Appeal. On September 18, 2017, the Ontario Court of Appeal dismissed the Company's appeal of the Leave Motion to permit the plaintiff to commence and proceed with the Class Action. Concurrently, the Ontario Court of Appeal granted leave for the plaintiff to proceed with their action against the former senior officers and directors in relation to the Restatement.

The Company filed an application for leave to appeal to the Supreme Court of Canada in November 2017, but the leave to appeal to the Supreme Court of Canada was dismissed in June 2018.

In December 2018, the parties agreed to a consent Certification Order, whereby the action against the former senior officers and directors was withdrawn and the Class Action would only proceed against the Company.

To date, counsel for the plaintiffs and defendant have completed (i) all document production and (ii) defence oral examinations for discovery. Counsel for the plaintiffs have served their expert reports on liability and damages.

Counsel for the plaintiffs and defendant have entered into a good faith procedural agreement (the "Procedural Agreement"). The parties have engaged the services of an experienced neutral, former Chief Justice of Ontario (the "Mediator"), to act as a mediator to assist the parties in resolving all pre-trial matters as set out in the Procedural Agreement. The parties have agreed to a pre-trial mediation before the Mediator, which was scheduled for April 2025 with an intention to have the case ready for trial by April 25, 2025. However, the mediation has been adjourned to the summer of 2025 as the parties continue to work with the Mediator to resolve outstanding procedural disputes. The Court has not yet scheduled trial dates. The Company continues to urge a trial as early as possible.

The Company firmly believes that it has a strong defense on the merits and will continue to vigorously defend itself against the Class Action through independent Canadian litigation counsel retained by the Company for this purpose. Due to the inherent uncertainties of litigation, it is not possible to predict the final outcome of the Class Action or determine the amount of potential losses, if any. However, the Company has determined that a provision for this matter as at December 31, 2024 was not required.

Toll Wash Plant Agreement with Ejin Jinda

In 2011, the Company entered into an agreement with Ejin Jinda, a subsidiary of China Mongolia Coal Co. Ltd., to toll-wash coal from the Ovoot Tolgoi Mine. The agreement had a duration of five years from the commencement of the contract and provided for an annual washing capacity of approximately 3.5 million tonnes of input coal.

Under the agreement with Ejin Jinda, which required the commercial operation of the wet washing facility to commence on October 1, 2011, the additional fees payable by the Company under the wet washing contract would have been $18.5 million. At each reporting date, the Company assesses the agreement with Ejin Jinda and has determined it is not probable that this $18.5 million will be required to be paid. Accordingly, the Company has determined that a provision for this matter as at December 31, 2024 was not required.

Special Needs Territory in Umnugobi

On February 13, 2015, the Soumber mining licenses (MV-016869, MV-020436 and MV-020451) (the "License Areas") were included into a special protected area (to be further referred as Special Needs Territory, the "SNT") newly set up by the Umnugobi Aimag's Civil Representatives Khural (the "CRKh") to establish a strict regime on the protection of natural environment and prohibit mining activities in the territory of the SNT.

On July 8, 2015, SGS and the chairman of the CRKh, in his capacity as the respondent's representative, reached an agreement (the "Amicable Resolution Agreement") to exclude the License Areas from the territory of the SNT in full, subject to confirmation of the Amicable Resolution Agreement by the session of the CRKh. The parties formally submitted the Amicable Resolution Agreement to the appointed judge of the Administrative Court for her approval and requested a dismissal of the case in accordance with the Law of Mongolia on Administrative Court Procedure. On July 10, 2015, the judge issued her order approving the Amicable Resolution Agreement and dismissing the case, while reaffirming the obligation of CRKh to take necessary actions at its next session to exclude the License Areas from the SNT and register the new map of the SNT with the relevant authorities. Mining activities at the Soumber property cannot proceed unless and until the Company obtains a court order restoring the Soumber mining licenses and until the License Areas are removed from the SNT.

On July 24, 2021, SGS was notified by the Implementing Agency of Mongolian Government that the license area covered by two mining licenses (MV-016869 and MV-020451) are no longer overlapping with the SNT. The Company will continue to work with the Mongolian authorities regarding the license area covered by the mining license (MV-020436).

On December 7, 2023, the Citizen representative Khural of Gurvantes soum held a meeting and passed a resolution (the "Gurvantes Soum Resolution") claiming that the License Areas were part of local special needs protection area. A request letter was sent to Mineral Resources and Petroleum Authority of Mongolia ("MRPAM") on January 4, 2024.

On January 11, 2024, MRPAM issued an official letter to the Citizen representative Khural of Gurvantes soum and concluded that request was not reasonable and the License Areas will not be registered on the Cadastre mapping system.

On June 18, 2024, the Court of First Instance in Umnugobi Province reviewed the above subject matter in which SGS is the plaintiff and Citizen's